Free Book Online
Categories
Molecules to Medicine with mTOR: Translating Critical Pathways into Novel Therapeutic Strategies

Pdf

Molecules to Medicine with mTOR: Translating Critical Pathways into Novel Therapeutic Strategies

4.5 (1414)

Log in to rate this item

    Available in PDF Format | Molecules to Medicine with mTOR: Translating Critical Pathways into Novel Therapeutic Strategies.pdf | Unknown
    Unknown
Molecules to Medicine with mTOR: Translating Critical Pathways into Novel Therapeutic Strategies is a one-stop reference that thoroughly covers the mechanistic target of rapamycin (mTOR). mTOR, also known as the mammalian target of rapamycin, is a 289-kDa serine/threonine protein kinase that is ubiquitous throughout the body and has a critical role in gene transcription and protein formation, stem cell development, cell survival and senescence, aging, immunity, tissue regeneration and repair, metabolism, tumorigenesis, oxidative stress, and pathways of programmed cell death that include apoptosis and autophagy. Incorporating a translational medicine approach, this important reference highlights the basic cellular biology of mTOR pathways, presents the role of mTOR during normal physiologic function and disease, and illustrates how the mechanisms of mTOR can be targeted for current and future therapeutic treatment strategies.  Coverage of mTOR signaling includes the entire life cycle of cells that impacts multiple systems of the body including those of nervous, cardiovascular, immune, musculoskeletal, endocrine, reproductive, renal, and respiratory origin.Covers the role of mTOR by internationally recognized expert contributors in the field.Provides a clear picture of the complexity of mTOR signaling as well as of the different approaches that could target this pathway at various levels.Includes analysis of the role of mTOR and in both health and disease.Serves as an important resource for a broad audience of healthcare providers, scientists, drug developers, and students in both clinical and research settings.  
3.4 (3302)
  • Pdf

*An electronic version of a printed book that can be read on a computer or handheld device designed specifically for this purpose.

Formats for this Ebook

PDF
Required Software Any PDF Reader, Apple Preview
Supported Devices Windows PC/PocketPC, Mac OS, Linux OS, Apple iPhone/iPod Touch.
# of Devices Unlimited
Flowing Text / Pages Pages
Printable? Yes

Book details

  • PDF | 472 pages
  • Unknown
  • Academic Press
  • Unknown
  • 2
  • Medical Books
Read online or download a free book: Molecules to Medicine with mTOR: Translating Critical Pathways into Novel Therapeutic Strategies

Review Text

Name:
The message text:

Miscellanea